Projects Icon Projects
Cachoeira

Overview:

The Cachoeira project has had a long history of gold mining dating back to the 17th century with more recent exploration completed by Goldfields, Vale and Trek Mining (previously Luna Gold). The greenstone hosted orogenic gold mineralization is hosted in three deposits that on average have been defined by drilling to 125 m depth on average. The eastern margin of the greenstone belt has several coincident soil and geophysical anomalies that have not been tested drilling. Mining concessions cover the three deposits.

Commodity: Gold

Ownership: 100%

Location: Para State

Infrastructure: Paved highway, water, nearby electrical power grid

Property Size: 5,677 Ha

Deposit Type: Orogenic

Resource:

  • Indicated: 17.5 Mt grading 1.23 g/t gold (691,676 oz) at 0.35 gold g/t cut-off
  • Inferred: 15.7 Mt grading 1.07 g/t gold (537,756 oz) at 0.35 g/t gold cut-off
  • Please refer to Resource Statement page for assumptions and notes for each respective resource estimate.

Drilling: 773 holes (37,099 m)

Technical Report: Cachoeira 2013 Technical Report (Resource Estimate)

Images: Cachoeira Images

Subscribe to our GoldMining Investment Newsletter