Projects Icon Projects
São Jorge

Overview:

The São Jorge project hosts near surface gold mineralization that is potentially amenable to open pit extraction and gravity-CIL processing. The project is 4 km west of Highway BR163 and is accessed by several gravel roads that cross the property. Eldorado Goldꞌs feasibility stage Tocantinzinho deposit and Serabiꞌs Palito mine, occur along the same major structural zone that hosts the São Jorge deposit. Gold mineralization at São Jorge is hosted in granitic rocks and is associated with northwest-southeast striking shear zones. The deposit is open at depth and is prospective to the southeast.

Commodity: Gold

Ownership: 100%

Location: Para State

Infrastructure: Paved highway, water, nearby electrical power grid

Property Size: 45,997 Ha

Deposit Type: Orogenic

Resource:

  • Indicated: 14.28 Mt grading 1.55 g/t gold (711,800 oz) at 0.3 g/t gold cut-of
  • Inferred: 17.58 Mt grading 1.27 g/t gold (716,800 oz) at 0.3 g/t gold cut-off

Drilling: 145 holes (37,154 m)

Technical Report: São Jorge 2021 Technical Report (Resource Estimate)

Images: Sao Jorge Images

Subscribe to our GoldMining Investment Newsletter